Integration

RunBlu + Procore: Project Context Meets Material Reality

Connect RunBlu's material control layer with Procore's project management platform. Project context flows in, material consumption data flows out. Your Procore view stays current with actual material usage.

How it works

1

RunBlu connects to Procore's REST API using OAuth 2.0 authentication

2

Active projects, cost codes, and procurement data sync from Procore to RunBlu automatically

3

Material events in RunBlu (receiving, allocation, installation, returns) are tagged with Procore project and cost code references

4

Material consumption data flows back to Procore's financial view for accurate job costing

5

Sync runs continuously — no manual exports or imports required

Data flow

FromDirectionToData
ProcoreRunBluActive projects and phases
ProcoreRunBluCost codes and budgets
ProcoreRunBluProcurement commitments (POs)
RunBluProcoreMaterial consumption by project
RunBluProcoreActual material costs per job
RunBluProcoreReconciliation data and variances

Data flow diagram — coming soon

Setup guide

1

Authenticate with Procore

Connect your Procore account via OAuth. RunBlu requests read access to projects, cost codes, and commitments, and write access for cost data.

2

Map projects and cost codes

RunBlu auto-discovers your active Procore projects. Map your material categories to Procore cost codes (or accept the auto-suggestions).

3

Configure sync preferences

Choose which data flows to enable, sync frequency, and notification preferences for variances.

4

Verify and go live

RunBlu runs a test sync, validates data mapping, and confirms the connection. The integration is live within hours.

Use cases

Accurate job costing

Procore's financial view reflects actual material consumption from RunBlu — not estimates, not PO values, but what was physically installed on each job.

Procurement visibility

When RunBlu receives material, it automatically matches against Procore POs. Short shipments, overages, and wrong material are flagged immediately.

Budget accuracy

Material variances surface in real-time in both systems. PMs see budget impact in Procore the moment material consumption deviates from plan.

Cross-project material sharing

When one project has excess material and another needs it, RunBlu shows the opportunity. Transfer events update both projects in Procore automatically.

Frequently Asked Questions

How long does setup take?

Most integrations are live within 4-8 hours. The OAuth connection is instant. Project mapping typically takes 1-2 hours. The rest is configuration and verification.

Does it work with Procore's mobile app?

The integration syncs data at the platform level. Material data updated in RunBlu appears in Procore's financial views on all platforms including mobile. Field teams use RunBlu's mobile interface for material operations.

What Procore plan do I need?

The integration uses Procore's REST API, which is available on all Procore plans. You need API access enabled by your Procore admin.

Can I disconnect the integration?

Yes, at any time. RunBlu continues to function independently. Historical data that was synced to Procore remains in Procore. No data is lost in either system.

Ready to connect RunBlu + Procore?

Book a walkthrough and we'll show you the integration in action.